CROP PROTECTION
Bacillus amyloliquefaciens PKM16 acts as an antagonist of white mold and an inducer of defense enzymes in tomato plants
Bacillus amyloliquefaciens PKM16 acts as an antagonist of white mold and an inducer of defense enzymes in tomato plants
Acta Scientiarum. Agronomy, vol. 45, e59586, 2023
Editora da Universidade Estadual de Maringá - EDUEM
Received: 08 July 2021
Accepted: 05 October 2021
ABSTRACT: This study aimed to investigate the potential of rhizobacteria isolated from tomato plants to control Sclerotinia sclerotiorum and induce the activity of pathogenesis-related enzymes in Micro-Tom tomato plants. Three rhizobacterial isolates were evaluated to determine the most efficient antagonist agent, which was later identified by gene sequencing as Bacillus amyloliquefaciens PKM16. The antagonistic effects of B. amyloliquefaciens against S. sclerotiorum were assessed in vivo and in vitro using live and autoclaved cultures at concentrations of 0% (control), 20%, 30%, and 40% (v/v). The residual effects of four treatments (20% live culture, 20% autoclaved culture, a Bacillus subtilis-based commercial product, and autoclaved distilled water) on tomato plants inoculated with S. sclerotiorum were determined. The same treatments were also used to assess the myceliogenic germination of sclerotia and induction of plant defense enzymes (peroxidase, catalase, polyphenol oxidase, phenylalanine ammonia-lyase, and β-1,3-glucanase) in tomato plants. The live culture had a residual effect for 4 days and inhibited sclerotial germination by approximately 30%. Furthermore, live and autoclaved bacterial growth cultures stimulated enzyme activity. Therefore, B. amyloliquefaciens PKM16 was antagonistic to S. sclerotiorum, effectively inhibiting mycelial growth and activating defense mechanisms in Micro-Tom tomato plants.
Keywords: Biological control, defense mechanisms, micro-tom, pathogenesis-related proteins, rhizobacteria, Sclerotinia sclerotiorum.
Introduction
Tomato plants (Solanum lycopersicum) are the second most cultivated Solanaceae plants in Brazil with an estimated production of 3,956,687 t per year on 55,034 ha, mainly in the southeastern region (IBGE, 2021). Tomato production has great social and economic importance in the country as it generates jobs, income, and food and helps strengthen the family agriculture sector (Carvalho, Ponciano, Souza, Souza, & Sousa, 2014). However, tomato plants are susceptible to diseases and pests, which drastically reduce crop quality and yield. The fungus Sclerotinia sclerotiorum (Lib.) de Bary, the causal agent of white mold disease, is one of the main pathogens of tomato plants. This pathogen is difficult to control in infected fields, particularly when predisposing factors are present, such as high crop density, long periods of rainfall, high air humidity, and mild temperatures (15-21°C) (Reis, Costa, & Lopes, 2007).
The control of white mold is largely based on preventive measures to avoid field contamination. Crop rotation has limited efficacy as there are no resistant varieties or hybrids, and the pathogen is polyphagous (S. sclerotiorum can affect 75 plant families and more than 400 species) (Jaccoud Filho, Henneberg, & Grabicoski, 2017). Chemical control is not always efficient due to the difficulty in treating the soil, where the fungus forms survival structures known as sclerotia (Reis et al., 2007). Integrated management strategies that combine chemical, biological, and cultural control are the most commonly used approaches (Jaccoud Filho et al., 2017).
Plant growth-promoting rhizobacteria have been studied for their ability to produce phytohormones and antimicrobial compounds and activate latent plant defense mechanisms involving pathogenesis-related proteins (Li et al., 2015; Singh, Yadav, Chaudhary, Rana, & Sharma, 2016; Pascholati & Dalio, 2018). Motivated by the increasing demand for control agents that can be applied to agroecological farming systems, several studies have been conducted in recent years on the use of rhizobacteria as biological control agents and elicitors of plant resistance (Toledo, Costa, Bacci, Fernandes, & Souza, 2011). This study aimed to investigate the potential of rhizobacterial isolates to control S. sclerotiorum and activate resistance mechanisms in tomato plants.
Material and methods
Experiments were carried out in a greenhouse from March 2018 to December 2019. Rhizobacteria were isolated from the rhizosphere of tomato plants by serial dilution and plating on nutrient agar. Three selected isolates (RB1, RB2, and RB3) stood out among others that produced large inhibition zones against microorganisms, such as fungi and bacteria. Colonies were streaked on nutrient agar until pure cultures were obtained. Isolates were maintained in nutrient broth and nutrient agar in a biochemical oxygen demand (BOD) chamber at 28 ± 2°C in the dark.
S. sclerotiorum was obtained from the Phytopathology Laboratory of the State University of Ponta Grossa (Ponta Grossa, Paraná State, Brazil), identified by the code CMM-2969 in the Culture Collection of Phytopathogenic Fungi Maria Menezes. The fungus was reactivated in potato dextrose agar (PDA) in a BOD chamber at 24 ± 2°C with a 12h photoperiod. The control treatment consisted of only phytopathogens on one side of the plate.
The antagonistic effects of rhizobacterial isolates against S. sclerotiorum were assessed using the direct confrontation method (Dennis & Webster, 1971). A disk of 8 mm in diameter was cut from the fungal culture and placed approximately 1 cm from the margin of a PDA plate, and isolates were streaked close to the opposite margin. The plate was incubated in a BOD chamber at 24 ± 2°C with a 12h photoperiod.
A similar test was performed to assess the inhibitory effects of the volatile compounds produced by the isolates; however, the PDA plate was subdivided into sections to avoid direct contact between microorganisms. The plate was incubated in a BOD chamber at 24 ± 2°C with a 12h photoperiod. In both tests, mycelial growth was measured daily at two diametrically opposite points after 24h of incubation. These measurements were used to calculate the area under the mycelial growth curve (AUMGC) (Shaner & Finney, 1977) and the percentage of mycelial growth inhibition.
The experiments were repeated and conducted in a completely randomized design with seven replicates. Each plate was considered an experimental unit. Data were subjected to analysis of variance, and means were compared using the Scott-Knott test at p < 0.05 with R software (R Core Team, 2020).
Bacterial isolate identification
The isolate with the highest inhibitory activity against S. sclerotiorum in the direct confrontation and volatile compound assays was sent to the Laboratory of Microbial Physiology and Genetics of the Federal University of Lavras (Minas Gerais State, Brazil) for identification by gene sequencing. The isolate was identified as Bacillus amyloliquefaciens PKM16 (98% similarity, GenBank accession number KF732989.1) and deposited in the Culture Collection of Agricultural Microbiology (code CCMA-2020). The isolate was maintained in nutrient broth and nutrient agar in a BOD chamber at 28 ± 2°C in the dark.
In vitro mycelial inhibition of S. sclerotiorum and reduction of white mold severity in tomato plants with different live and autoclaved culture concentrations
Nutrient broth was inoculated with the rhizobacterial strain and incubated at 28 ± 2°C in the dark for 48h. Then, 1 mL of rhizobacterial culture was adjusted to an optical density (OD600) of 0.6 (1 × 108 ufc), mixed with 210 mL of nutrient broth, and incubated at 28 ± 2°C and 180 rpm for 48h. In vitro and in vivo assays were performed to assess the antagonistic action of the live culture (produced metabolites + viable bacterial cells) and autoclaved culture (produced metabolites + non-viable bacterial cells) of B. amyloliquefaciens PKM16 at different concentrations (0, 20, 30, 40, and 50%) against S. sclerotiorum.
For the in vitro assay, the live culture was added and homogenized with autoclaved PDA before solidification. The autoclaved culture was obtained by mixing active cultures with PDA and autoclaving at 121°C (1 atm) for 25 min. The media were poured into Petri dishes, and the plates were allowed to solidify. An 8 mm mycelial disc of S. sclerotiorum (previously grown in PDA for 7 days) was placed at the center of each plate, and the plates were incubated at 20 ± 2°C. Mycelial growth was analyzed every 24h by measuring the distance between diametrically opposite points. Measurements were conducted until the pathogen reached the edges of the control plate. The results are presented as the AUMGC and the percentage of mycelial growth inhibition.
In vivo experiments were conducted using Micro-Tom tomato plants, which are considered an excellent model for the study of biological processes. Micro-Tom tomato plants are a miniature tomato cultivar that produces viable fruits and seeds in 70-90 days when grown in 50-150 mL pots (Meissner et al., 1997). Seeds from the State University of Western Paraná were sown in 128-cell polystyrene trays containing a commercial substrate (MecPlant®; Telêmaco Borba, Paraná State, Brazil). At 22 days after sowing, seedlings were transplanted to 500 mL plastic pots containing a 1:1:2 (v/v/v) mixture of soil, sand, and potting substrate fertilized with 0.5 g of 10-10-10 NPK fertilizer. Live and autoclaved cultures were diluted to the appropriate concentrations with autoclaved distilled water containing 0.01% Tween 20. Treatments were applied when the plants had developed five fully developed true leaves (29 days after sowing). The entire plant was sprayed to the point of runoff (200 mL).
Fungal cultures grown for 7 days on PDA were used as inocula. Inoculation was performed at 72h after treatment (HAT) with bacterial cultures. The third true leaf was cut 2 cm from the main stem, and a micropipette tip containing the mycelial disc was inserted into the cut stem. After inoculation, the plants were kept in a humidity chamber at 18 ± 2°C to stimulate disease development (Barros, Fonseca, Balbi-Peña, Pascholati, & Peitl, 2015).
Disease progression was analyzed after 2 days of inoculation (when the disease had reached the main stem). The lesion length was measured with a caliper every 24h for 5 days. Results are expressed as the area under the disease progress curve (AUDPC) and the percentage of lesion inhibition.
The experiments were repeated and conducted in a completely randomized design with six replicates. Each plate was considered an experimental unit, and each plant was considered an experimental unit. Data were subjected to analysis of variance, and means were compared using the Scott-Knott test at p < 0.05 with R software (R Core Team, 2020).
Residual effects of live and autoclaved culture treatments
Treatments were applied at 29 days after sowing (when the tomato plants had five true leaves). The following four treatments were used: autoclaved distilled water (control), 20% live culture, 20% autoclaved culture, and a biological commercial product containing Bacillus subtilis (minimum of 1 × 109 CFU g-1 asset), indicated for S. sclerotiorum control. The commercial product was applied at the manufacturer’s recommended dose (2-4 L ha-1; spray volume of 500-1,000 L ha-1). Plants were inoculated with S. sclerotiorum at 0, 24, 48, 72, 96, 122, and 144 HAT using the micropipette tip method and placed in a humidity chamber at 18 ± 2°C. Disease progression was analyzed after 2 days of inoculation (when the disease had reached the main stem). The lesion length was measured with a caliper every 24h for 5 days, (a total of 11 assessments per plant). Results are expressed as the AUDPC.
The experiments were repeated and conducted in a completely randomized design with six replicates. Each plant was considered an experimental unit. Data were subjected to analysis of variance, and means were compared using the Scott-Knott test at p < 0.05 with R software (R Core Team, 2020).
Myceliogenic germination of sclerotia
S. sclerotiorum was grown on PDA for 7 days at 20°C with a 12h photoperiod. Then, the fungus was transferred to new PDA plates and kept under the same conditions for 20 days to induce the production of sclerotia. Sclerotia were collected, disinfected with 70% alcohol for 60 s followed by 2% (v/v) sodium hypochlorite for another 60 s, and rinsed with autoclaved distilled water (Marcuzzo & Schuller, 2014). Disinfected sclerotia were immersed for 10 min in one of the following treatments: 20% live culture, 20% autoclaved culture, commercial product, and autoclaved distilled water. After treatment, sclerotia were placed in Petri dishes containing Neon medium (1 L PDA + 50 mg bromophenol blue) and incubated at 20 ± 2°C with a 12h photoperiod to stimulate germination (adapted from Napoleão, Nasser, Lopes, & Cafe Filho, 2006). The number of sclerotia that germinated and produced hyphae was recorded daily.
The experiment was repeated and carried out in a completely randomized design with six replicates. Each plate containing 10 sclerotia was used as the experimental unit. Data were subjected to Kaplan-Meier (1958) survival analysis (Dudley, Wickham, & Coombs, 2016) using the “survfit” function of the “survival” package in R software. Survival curves were compared using the G-rho test (log-rank test) (Ihaka & Gentleman, 1996).
Activity of plant defense enzymes
Treatments (20% live culture, 20% autoclaved culture, commercial product, and autoclaved distilled water) were applied when plants had five true leaves (29 days after sowing), and fungal inoculation was performed at 48 HAT using the micropipette tip method. For the analysis of enzyme activity, one leaf from each plant was collected before treatment application and at 24, 48, 72, 96, 120, and 144 HAT (always at the same time in the morning). During sampling, the collected leaves were placed between two sheets of aluminum foil and stored on ice. In the laboratory, the samples were weighed and stored at −80°C until enzyme extraction.
For enzyme extraction, 100 mg of leaves were ground in liquid nitrogen with a mortar and pestle and homogenized with 4 mL of 50 mM potassium phosphate buffer (pH 7.0) containing 0.1 mM EDTA and 1% (w/w) polyvinylpyrrolidone. The macerate was transferred to microtubes and centrifuged at 14,500 rpm for 30 min. at 4°C. The supernatant was transferred to new microtubes and stored at −80°C (Lusso & Pascholati, 1999).
Total protein was quantified using the Bradford (1976) method. Guaiacol peroxidase (POD), catalase (CAT), polyphenol oxidase (PPO), β-1,3-glucanase (GLU), and phenylalanine ammonia-lyase (PAL) activities were determined as described by Lusso and Pascholati (1999), Góth (1991) with modification by Tománková, Luhová, Petrivalský, Peè, and Lebeda (2006), Duangmal and Apenten (1999), Vogelsang and Braz (1993), and Umesha (2006), respectively.
The experiment was carried out in a completely randomized design using a [(4 × 6) + 1] factorial arrangement, consisting of water (control), live culture, autoclaved culture, and a commercial product at different times (24, 48, 72, 96, 120, and 144 HAT) with an additional condition designed to assess the effect of collection time on non-treated plants. Seven replications were performed, and each plant was considered an experimental unit. Enzyme assays were performed in duplicate. Data were subjected to analysis of variance. Differences (p < 0.05) between treatments were assessed using the Scott-Knott test, and differences (p < 0.05) between treated and non-treated plants were analyzed using Dunnett’s test. All statistical analyses were performed with R software (R Core Team 2020).
Results
In vitro mycelial inhibition of S. sclerotiorum
Direct confrontation between rhizobacteria and S. sclerotiorum revealed that two isolates (RB1 and RB2) were able to inhibit mycelial growth. Their AUMGC values (RB1 = 9.50, RB2 = 12.21) differed from each other and from the value of the control (15.23). RB3 had an AUMGC value of 14.04, which was not significantly different from the value of the control. The inhibition zone of RB3 was much smaller than that of other isolates, equivalent to a mycelial growth inhibition of less than 10%. RB1 showed the largest inhibition zone and inhibition percentage (40.27%) (Table 1). This isolate was also the most effective in reducing the final mycelial growth (Figure 1a).
Under the tested conditions, rhizobacterial isolates did not produce volatile compounds capable of inhibiting S. sclerotiorum mycelial growth, as demonstrated by the lack of difference in AUMGC values between the isolates and the control (Table 1).

Based on the analysis of growth characteristics, cell morphology, colony morphology, and gram-stained cells, RB1 and RB2 belonged to the genus Bacillus. Cells were rod-shaped, elongated, and gram positive, forming white, mucoid, and rough colonies with irregular edges. The cells multiplied rapidly in a liquid medium (Rabinovitch & Oliveira, 2015). As RB1 showed the best results against S. sclerotiorum, it was analyzed by gene sequencing, which confirmed its identity as Bacillus amyloliquefaciens. The isolate was then assessed in further experiments. RB3 was characterized by coccus-shaped cells, non-mucoid white colonies, and slow growth, differing greatly from other isolates. The results indicated that it likely belonged to another genus of soil-dwelling bacteria. However, RB2 and RB3 were not identified in the present study.

In vitro mycelial inhibition of S. sclerotiorum and reduction of white mold severity in tomato plants with different live and autoclaved culture concentrations
In the in vitro assay, the live culture completely inhibited fungal development at all concentrations (data not shown). The autoclaved culture inhibited fungal development only at concentrations above 30%; at 50%, the treatment resulted in the lowest AUMGC value (7.50) and the highest growth inhibition (32%) (Figure 2).
In the in vivo assay, the control had an AUDPC value of 16. The AUDPC was significantly different between the live culture and the control but not between different live culture concentrations. The mean AUDPC value and growth inhibition rate were 11 and 32%, respectively. The autoclaved culture decreased the AUDPC to 12 at 20% and to 9 at 30%, resulting in a growth inhibition of 33 and 25%, respectively. At these concentrations, the effect of the autoclaved culture was similar to that of the live culture. However, the autoclaved culture at 40 and 50% allowed disease development, which was not significantly different from the effect of the control (Figure 3).
The live culture of B. amyloliquefaciens PKM16 did not completely inhibit disease progression in tomato plants. The dose-dependent response of S. sclerotiorum to the autoclaved culture observed in the in vitro assay was not observed in the in vivo assay. The results showed that 20% was the optimal concentration for live and autoclaved cultures.
Residual effects of live and autoclaved culture treatments
The AUDPC was low for plants inoculated with the pathogen at 48 HAT. The live culture and the commercial product showed the best results (inhibition of 35%); they did not differ from each other but differed from the control (autoclaved distilled water). The autoclaved culture also reduced the AUDPC in plants inoculated with the pathogen at 48 HAT. For plants inoculated at 24 HAT, the commercial product showed the best results. Treatment with the live culture resulted in the greatest reduction in disease development in plants inoculated at 72 HAT. Disease progression was slow in plants inoculated at 96 HAT; however, only the live culture and the commercial product differed from the control. In plants inoculated before treatment and at 120 HAT, no differences were observed between treatments (Table 2).
The results showed that the residual effect of the live culture persisted for 48 to 96h. Therefore, the live culture should be reapplied every 2 to 4 days for white mold management in Micro-Tom tomato plants. After 120h, the live culture did not affect white mold severity. The residual effect of the autoclaved culture lasted for 48h; thus, it should be applied every 2 days.



Myceliogenic germination of sclerotia
Sclerotia treated with the control (autoclaved distilled water) began to germinate on day 3 after inoculation and achieved almost complete germination by day 5 (Figure 4a). Sclerotia treated with the autoclaved culture began to germinate later than the control but was completely germinated by day 7 (Figure 4b), which was statistically significant. Sclerotia treated with the commercial product based on B. subtilis showed a curve similar to that of sclerotia treated with the autoclaved culture despite a lower germination rate (Figure 4c); both of them differed from the control. Treatment with the live culture showed the best results; at 7 days after inoculation, the germination rate was approximately 30% compared with the complete sclerotial germination of the other treatment groups (Figure 4d).

Activity of plant defense enzymes
POD activity was considerably higher at 48h after pathogen inoculation (96 HAT) when fungal colonization began. The highest activity was observed in plants treated with the autoclaved culture, followed by water, the commercial product, and the live culture. Enzyme activity was markedly increased at 96h after pathogen inoculation (144 HAT) and was the highest in plants treated with the commercial product, followed by the autoclaved culture, water, and the live culture (Figure 5a). As the POD activity pattern of plants treated with water was similar to that of plants treated with biological agents, POD activity may be associated with pathogen colonization (Amorim & Pascholati, 2018).
CAT activity was also increased significantly after pathogen inoculation. At 24h after inoculation (72 HAT), higher CAT activity was observed in plants treated with the commercial product, live culture, and autoclaved culture. However, the highest CAT activity was detected at 96h after inoculation (144 HAT) in plants treated with the commercial product, followed by plants treated with the autoclaved culture (Figure 5b).
PAL activity was the highest in plants treated with water and autoclaved culture at 96h after inoculation (144 HAT). Although this peak may be attributed to pathogen infection, PAL activity was also significantly induced on day 3 after treatment with B. amyloliquefaciens (Figure 5c). Peak PPO activity was observed at 24h after inoculation (72 HAT) in plants treated with the live culture. Live culture treatment also resulted in high enzyme activity at 48h after inoculation (96 HAT); however, the effects of other treatments were not significantly different (Figure 5d).
In addition to POD, CAT, PPO, and PAL, GLU may play an important role in disease resistance signaling. GLU activity was increased from 48 HAT. At 24h after inoculation, plants treated with the commercial product showed the highest GLU activity. Peak GLU activity was observed at 96h after inoculation (144 HAT) in plants treated with the live culture (Figure 5e).

Discussion
Direct confrontation and volatile compounds
Rhizobacteria can inhibit the development and spread of pathogens by competing for resources and producing soluble or volatile antimicrobial compounds (Vinodkumar, Nakkeeran, Renukadevi, & Malathi, 2017; Guevara-Avendaño et al., 2018). Several studies have reported the emission of volatile antimicrobial compounds by rhizobacteria (Méndez-Bravo et al., 2018, Guevara-Avendaño et al., 2019), including against S. sclerotiorum (Giorgio, Angelo, Pietro, & Nicola, 2015). Nevertheless, as highlighted by Mariano (1993), test sensitivities may differ according to the type of analysis conducted and the variables analyzed, and control efficiency may vary with the phytopathogen and antagonistic isolates. Braga Junior et al. (2017) observed that the in vitro effects of B. subtilis on Fusarium subglutinans, Curvularia lunata, and Bipolaris sp. differed according to the test performed. The authors performed four assays and found that in some tests, bacteria were able to inhibit mycelial growth by producing volatile and/or thermostable metabolites; however, in other tests, these effects were not observed.
Vieira, Vieira, Sousa, and Mendonça (2016) investigated the action of B. subtilis against Fusarium solani f. sp. phaseoli, Fusarium oxysporum f. sp. phaseoli, Macrophomina phaseolina, and Rhizoctonia solani and found that the bacterial isolate BSV-05 did not produce volatile metabolites. Michereff, Silveira, and Mariano (1994) evaluated the activity of B. subtilis (BSV-05) isolates against Colletotrichum graminicola and observed that thermostable, soluble, and non-volatile bacterial metabolites were antagonistic to phytopathogens. These studies demonstrated that Bacillus isolates could produce metabolites with different properties and modes of action.
Soluble antibiotics, such as lipopeptides, are produced at different concentrations by a variety of rhizobacteria. These compounds may vary in their pathogen control efficiency (Yarzabal & Chica, 2019). Li et al. (2015) showed that different strains of B. amyloliquefaciens produced different types of lipopeptides in the presence of different pathogens. An in vitro study (Chowdhury, Hartmann, Gao, & Borriss, 2015) found that the antifungal activity of some Bacillus species, including B. amyloliquefaciens, may be attributed to the non-ribosomal synthesis of the lipopeptides bacillomycin D, fengycin, and surfactin. Bacillomycin D was observed to have high in vitro activity against Fusarium pathogens (Li et al., 2015). Li et al. (2014) showed that the activity of B. amyloliquefaciens SQR9 against S. sclerotiorum, R. solani, and F. solani may be mediated by surfactin, whereas the activity of the strain against Verticillium dahliae, F. oxysporum, F. solani, and Phytophthora parasitica may be mainly mediated by fengycin.
The action of rhizobacteria against phytopathogens may also be attributed to the activity of hydrolytic enzymes on the microbial cell wall. Rocha and Moura (2013) observed that the rhizobacteria of the genus Pseudomonas, Bacillus, and Streptomyces produced antimicrobial enzymes that reduced the in vitro mycelial growth of R. solanacearum and F. oxysporum f. sp. lycopersici. Some Bacillus isolates produced chitinase and lipase and were able to solubilize calcium phosphate.
The preliminary in vitro assay revealed that RB1, identified as B. amyloliquefaciens PKM16, had significant fungitoxic activity. Biocontrol agents may not only affect phytopathogens but may also induce disease resistance in plants (Huang et al., 2016; Singh et al., 2016).
In vitro mycelial inhibition of S. sclerotiorum and reduction of white mold severity in tomato plants with different live and autoclaved culture concentrations
Around 8.5% of the genome of B. amyloliquefaciens is involved in the synthesis of secondary metabolites, such as lipopeptides (surfactin, iturin, bacillomycin D, and fengycin), polyketides (macrolactin and bacillaene), volatile compounds (acetoin), and hydrolytic enzymes (cellulase, amylase, protease, and chitinase). These compounds may be directly associated with the pathogen-inhibiting and resistance-inducing effects of B. amyloliquefaciens in plants (Chen et al., 2009).
Live and autoclaved cultures had different effects on S. sclerotiorum mycelial growth. It is possible that some of the antimicrobial compounds produced by B. amyloliquefaciens PKM16 were thermolabile, i.e., they may have degraded during autoclaving (121°C, 1 atm, 25 min.). As a result, the autoclaved culture likely contained lower concentrations of these compounds. The live culture may also have performed better than the autoclaved culture because live bacteria can compete with fungi for nutrients and space. Furlani, Camargo, Panizzi, and Pereira (2007) showed that autoclaved microbial cultures had no in vitro effects on Colletotrichum acutatum. On the other hand, a filtered culture solution was highly effective in inhibiting mycelial growth. In this case, as the solution was filtered, antagonistic effects may most likely be attributed to the action of thermolabile metabolites instead of microbial competition for resources.
Gomes, Grigoletti Junior, and Auer (2001) investigated the in vitro effects of autoclaved and non-autoclaved B. subtilis broth cultures at concentrations of 10, 50, and 100% on the germination of Cylindrocladium spathulatum conidia; inhibition was greater at culture concentrations of 50% and 100%. In contrast, in the present study, a bacterial culture concentration of 20% was sufficient to completely inhibit S. sclerotiorum. However, Gomes et al. (2001) found that the non-autoclaved culture had a higher inhibitory activity, as observed in the current study. Li et al. (2015) quantified F. oxysporum, Botrytis cinerea, and Alternaria spp. in the cucumber rhizosphere treated with 1 and 10% Bacillus and obtained better results with 10% Bacillus.
In vitro results showed that B. amyloliquefaciens PKM16 was effective in inhibiting the growth of S. sclerotiorum. Although in vitro assays are valuable preliminary analyses, in vivo assays are essential for choosing the best microbial agent concentration as pathogen-host interactions and uncontrollable variables, such as temperature and humidity, are taken into account (Amorim, Rezende, & Bergamin Filho, 2018). Maciel, Walker, Muniz, and Araujo (2014) investigated the antagonistic action of B. subtilis against Fusarium sambucinum in Pinus elliottii. In vitro and in vivo assays confirmed its antagonistic effects; however, the antifungal activity of B. subtilis was lower in the in vivo assay. Rocha and Moura (2013) performed in vivo assays in two different seasons and found that a Bacillus isolate was effective only under mild climatic conditions (less favorable to the pathogen). This result demonstrated the influence of climate and plant factors on the action of biocontrol agents (Amorim et al., 2018). In the present study, in vitro and in vivo assays showed that 20% was the optimal concentration for live and autoclaved cultures.
Residual effects and myceliogenic germination of sclerotia
The study was conducted under temperature and humidity conditions that were favorable for pathogen growth. Therefore, it is likely that the residual effect would have been greater under less favorable conditions. In comparison with the autoclaved culture, the live culture of B. amyloliquefaciens PKM16 had a higher residual effect. As discussed above, this may likely be attributed to the thermosensitivity of metabolites and competition with live microorganisms for resources.
The live culture was also highly effective in inhibiting the myceliogenic germination of sclerotia. Giorgio et al. (2015) found that Pseudomonas and Bacillus isolates produced volatile compounds with the potential to inhibit S. sclerotiorum sclerotial germination. Overall, the B. subtilis-based commercial product and B. amyloliquefaciens PKM16 culture showed high inhibition efficiencies, demonstrating the antimicrobial potential of Bacillus.
Sclerotia are highly resistant to adverse environmental factors and may survive in the soil for several years even in the absence of a host (Lane, Denton-Giles, Derbyshire, & Kamphuis, 2019), which make it difficult for white mold management in the field. Therefore, the inhibitory effects of B. amyloliquefaciens PKM16 on sclerotial germination suggest that this strain has great potential to control the fungus under field conditions.
Plant defense enzymes
As a plant defense mechanism, pathogenesis-related proteins are activated by biotic or abiotic inducers. Phytopathogens can also trigger defense responses when they infect plants (Pascholati & Dalio, 2018). Previous studies have demonstrated the efficiency of different strains of B. amyloliquefaciens in inducing the expression of genes related to plant protection in the absence or presence of pathogens. PR-1 genes were highly expressed in cucumber leaves on days 2 and 3 after treatment with B. amyloliquefaciens FJ02 (Li et al., 2015). Micro-Tom tomato plants treated with B. amyloliquefaciens WF02 highly expressed pathogenesis-related genes 1 day after inoculation with R. solanacearum (Huang et al., 2016).
In the present study, both CAT and POD showed peak activity at 96h after pathogen inoculation (144 HAT). Peak enzyme activity indicated that the fungus was growing rapidly. Treatments induced CAT and POD activities; however, their effects were masked by the influence of S. sclerotiorum, which is extremely aggressive towards Micro-Tom tomato plants. The fungus secretes cell wall-degrading enzymes, leading to severe stress conditions. As a result, the plants synthesize reactive oxygen species (ROS), such as H2O2, which cause oxidative damage to proteins, lipids, and nucleic acids (Pascholati & Dalio, 2018).
Plants use enzymatic and non-enzymatic antioxidant systems to combat oxidative stress caused by ROS (Reczek & Chandel, 2015). According to Sharma, Jha, Dubey, and Pessarakli (2012), the oxidative stress response is the initial plant defense response to phytopathogens. The synthesis of antioxidant enzymes, such as CAT and POD, increases under these conditions.
POD oxidizes organic material by eliminating H2O2 in the cytosol and chloroplasts using phenolic compounds as electron donors (Locato, Pinto, Paradiso, & Gara, 2010). An increase in POD activity from day 3 after treatment was observed by Li et al. (2015). The authors reported peak POD activity on day 7, probably due to excess H2O2 production. Similarly, CAT reduces excess ROS by converting H2O2 to oxygen and water. CAT activity is crucial under severe stress conditions.
S. sclerotiorum secretes dicarboxylic acid oxalate to facilitate colonization. This compound induces host cell death and regulates ROS generation. At the beginning of infection, oxalate maintains stable levels of ROS so that plants do not recognize the fungus, leading to successful colonization. In the later stages of infection, oxalate induces ROS generation and host cell apoptosis (Kabbage, Yarden, & Dickman, 2015). ROS have distinct biological functions depending on their concentrations in the host. For instance, when present at high concentrations, they cause severe damage to cellular components; however, at low concentrations, they act as signaling molecules in defense pathways (Sharma et al., 2012).
PAL activity was the highest at 72 HAT. In the study by Li et al. (2015), PAL activity was also significantly higher in cucumber plants treated with B. amyloliquefaciens LJ02 than in the control on day 3. Similar to the activity of other enzymes, PAL activity in plants can be affected by pathogen infection. Huang et al. (2016) treated tomato plants with B. amyloliquefaciens and exposed the plants to Ralstonia solanacearum; PAL activity was considerably higher on day 3 after pathogen inoculation in control plants.
PAL contributes to plant defense by stimulating the synthesis of phenolic compounds (Oliveira Varanda, & Félix, 2016). Phenolic compounds exert vital antioxidant activity and may serve as substrates for lignin synthesis (Gerasimova et al., 2005).
PPO is strongly associated with PAL as it oxidizes phenolic compounds, favoring the formation of H2O2 and contributing to lignin biosynthesis. For example, the oxidation of phenol chlorogenic acid hinders pathogen penetration in plants due to the polymerization of phenolic barriers in the cell wall and the generation of an unfavorable environment for pathogen development (Yuan, Li, Hu, & Wu, 2002). Li et al. (2015) found that PPO activity was increased rapidly on day 3 after treatment with 1% B. amyloliquefaciens LJ02. An increase in PPO activity indicates cell damage and pathogen penetration.
GLU is associated with the hydrolysis of the fungal cell wall. Pathogen infection stimulates GLU synthesis in plants. The enzyme acts on the cell middle lamella, degrading fungal hyphae. These hydrolyzed structures induce higher concentrations of GLU. The greater the extent of colonization, the greater the synthesis of GLU in plants as a means to contain the infection (Stangarlin et al., 2011).
In this study, enzyme activity may have been induced by the bacterium and its metabolites, which may be related to plant defense and biotic stress. Micro-Tom tomato plants have a short life cycle (Meissner et al., 1997) and a potentially rapid metabolism, and S. sclerotiorum is aggressive (Jaccoud Filho et al., 2017) and can completely destroy the plants in less than a week, which may explain the effect of pathogen infection on enzyme activity after inoculation. This effect might have masked the action of Bacillus amyloliquefaciens PKM16. Plants treated with the control and autoclaved culture, which was not as effective in controlling white mold as the live culture, had the highest enzyme activity on day 6. Therefore, it can be concluded that because the control and autoclaved culture were not able to control the fungus, the pathogen was able to develop and damage the plants, causing an increase in enzyme activity.
Conclusion
The results showed that B. amyloliquefaciens PKM16 was antagonistic to S. sclerotiorum. The strain effectively inhibited in vitro mycelial growth, in vivo disease severity, and in vitro sclerotial germination. The residual effect of the live culture (which contains live bacterial cells and metabolites) lasted up to 4 days. In addition to its effect on the phytopathogen, B. amyloliquefaciens PKM16, as well as its metabolites, induced POD, CAT, PAL, POX, and GLU activities.
Acknowledgements
This study was supported by Coordenação de Aperfeiçoamento de Pessoal de Nível Superior Brasil (CAPES) and by Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
References
Amorim, L., & Pascholati, S. F. (2018). Ciclo das Relações Patógeno-Hospedeiro. In L. Amorim, J. A. M. Rezende, & A. Bergamin Filho (Eds.), Manual de Fitopatologia: Princípios e conceitos (p. 46-68). Ouro Fino, MG: Editora Agronômica Ceres Ltda.
Amorim, L., Rezende, J. A. M., & Bergamin Filho, A. (2018). Manual de Fitopatologia: Princípios e conceitos (v. 1, 5. ed.). Ouro Fino, MG: Editora Agronômica Ceres Ltda.
Barros, D. C. M., Fonseca, I. C. B., Balbi-Peña, M. I., Pascholati, S. F., & Peitl, D. C. (2015). Biocontrol of Sclerotinia sclerotiorum and white mold of soybean using saprobic fungi from semi-arid areas of Northeastern Brazil. Summa Phytopathologica, 41(4), 251-255. DOI: http://doi.org/10.1590/0100-5405/2086
Bradford, M. M. (1976). A rapid and sensitive method for the quantitation of microgram quantities of protein utilizing the principle of protein-dye binding. Analytical Biochemistry, 72(1-2), 248-254. DOI: https://doi.org/10.1016/0003-2697(76)90527-3
Braga Junior, G. M., Chagas Junior, A. F., Chagas, L. F. B., Carvalho Filho, M. R., Miller, L. O., & Santos, G. R. (2017). Controle biológico de fitopatógenos por Bacillus subtilis in vitro. Biota Amazônia, 7(3), 45-51. DOI: http://dx.doi.org/10.18561/2179-5746/biotaamazonia.v7n3p45-51
Carvalho, C. R. F., Ponciano, N. J., Souza, P. M., Souza, C. L. M., & Sousa, E. F. S. (2014). Viabilidade econômica e de risco da produção de tomate no município de Cambuci/RJ, Brasil. Ciência Rural, 44(12), 2293-2299. DOI: http://dx.doi.org/10.1590/0103-8478cr20131570
Chen, X. H., Koumoutsi, A., Scholz, R., Schneider, K., Vater, J., Süssmuth, R., … Borriss, R. (2009). Genome analysis of Bacillus amyloliquefaciens FZB42 reveals its potential for biocontrol of plant pathogens. Journal of Biotechnology, 140(1-2), 27-37. DOI: https://doi.org/10.1016/j.jbiotec.2008.10.011
Chowdhury, S. P., Hartmann, A., Gao, X., & Borriss, R. (2015). Biocontrol mechanism by root-associated Bacillus amyloliquefaciens FZB42-a review. Frontiers in Microbiology, 6(780), 1-12. DOI: https://doi.org/10.3389/fmicb.2015.00780
Dennis, C., & Webster, J. (1971). Antagonistic properties of species-groups of Trichoderma. III. Hyphal interactions. Transactions of the British Mycological Society, 57(3), 363-369. DOI: https://doi.org/10.1016/S0007-1536(71)80050-5
Duangmal, K., & Apenten, R. K. O. (1999). A comparative study of poliphenoloxidases from taro (Colocasiae sculenta) e potato (Solanum tuberosum var. Romano). Food Chemistry, 64(3), 351-359. DOI: https://doi.org/10.1016/S0308-8146(98)00127-7
Dudley, W. N., Wickham, R., & Coombs, N. (2016). An introduction to survival statistics: Kaplan-Meier analysis. Journal of the Advanced Practitioner in Oncology, 7(1), 91-100. DOI: http://dx.doi.org/10.6004/jadpro.2016.7.1.8
Furlani, A. C. F. A., Camargo, M., Panizzi, R. C., & Pereira, C. F. (2007). Atividade de células, filtrado e autoclavado de Bacillus spp. como bioagentes de controle de Colletotrichum acutatum. Científica, 35(2), 196-200.
Gerasimova, N. G., Pridvorova, S. M., & Ozeretskovskaya, O. L. (2005). Role of L phenylalanine ammonia-lyase in the induced resistance and susceptibility of potato plants. Applied Biochemistry and Microbiology, 41, 103-105. DOI: https://doi.org/10.1007/s10438-005-0019-3
Giorgio, A., Angelo, S., Pietro, C., & Nicola, S. I. (2015). Biocide effects of volatile organic compounds produced by potential biocontrol rhizobacteria on Sclerotinia sclerotiorum. Frontiers in Microbiology, 6(1056), 1-13. DOI: https://doi.org/10.3389/fmicb.2015.01056
Gomes, N. S. B., Grigoletti Junior, A., & Auer, C. G. (2001). Seleção de antagonistas para o controle de Cylindrocladium spathulatum em erva-mate. Boletim de Pesquisa Florestal, 43, 123-138.
Góth, L. (1991). A simple method for determination of serum catalase activity and revision of reference range. Clinica Chimica Acta, 196(2-3), 143-151. DOI: https://doi.org/10.1016/0009-8981(91)90067-m
Guevara-Avendaño, E., Bejarano-Bolívar, A. A., Kiel-Martínez, A. L., Ramírez-Vázquez, M., Méndez-Bravo, A., von Wobeser, E. A., … Reverchon, F. (2019). Avocado rhizobacteria emit volatile organic compounds with antifungal activity against Fusarium solani, Fusarium sp. associated with Kuroshio shot hole borer, and Colletotrichum gloeosporioides. Microbiological Research, 219, 74-83. DOI: https://doi.org/10.1016/j.micres.2018.11.009
Guevara-Avendaño, E., Carrillo, J. D., Ndinga-Muniania, C., Moreno,k., Méndez-Bravo, A., Guerrero-Analco, J. A., … Reverchon, F. (2018). Antifungal activity of avocado rhizobacteria against Fusarium euwallaceae and Graphium spp., associated with Euwallacea spp. nr. fornicatus, and Phytophthora cinnamomi.Antonie Van Leeuwenhoek, 111, 563-572. DOI: https://doi.org/10.1007/s10482-017-0977-5
Huang, C. N., Lin, C. P., Hsieh, F. C., Lee, S. K., Cheng, K. C., & Liu, C. T. (2016). Characterization and evaluation of Bacillus amyloliquefaciens strain WF02 regarding its biocontrol activities and genetic responses against bacterial wilt in two different resistant tomato cultivars. World Journal of Microbiology and Biotechnology, 32(11), 183. DOI: https://doi.org/10.1007/s11274-016-2143-z
Ihaka, R., & Gentleman, R. (1996). R: A Language for Data Analysis and Graphics. Journal of Computational and Graphical Statistics, 5, 299-314.
Instituto Brasileiro de Geografia e Estatística [IBGE]. (2021). Sistema de recuperação automática - Sidra. Levantamento Sistemático da Produção Agrícola. Retrieved on July 8, 2021 from Retrieved on July 8, 2021 from https://sidra.ibge.gov.br/pesquisa/lspa/tabelas
Jaccoud Filho, D. S., Henneberg, L., & Grabicoski, E. M. G. (2017). Mofo Branco: Sclerotinia sclerotiorum. Ponta Grossa, PR: Toda Palavra.
Kabbage, M., Yarden, O., & Dickman, M. B. (2015). Pathogenic attributes of Sclerotinia sclerotiorum: Switching from a biotrophic to necrotrophic lifestyle. Plant Science, 233, 53-60. DOI: https://doi.org/10.1016/j.plantsci.2014.12.018
Kaplan, E. L., & Meier, P. (1958). Nonparametric estimation from incomplete observations. Journal of the American Statistical Association, 53(282), 457-481. DOI: https://doi.org/10.2307/2281868
Lane, D., Denton-Giles, M., Derbyshire, M., & Kamphuis, L. G. (2019). Abiotic conditions governing the myceliogenic germination of Sclerotinia sclerotiorum allowing the basal infection of Brassica napu.Australasian Plant Pathology, 48(2), 85-91. DOI: https://doi.org/10.1007/s13313-019-0613-0
Li, Y., Gu, Y., Li, J., Xu, M., Wei, Q., & Wang, Y. (2015). Biocontrol agent Bacillus amyloliquefaciens LJ02 induces systemic resistance against cucurbits powdery mildew. Frontiers in Microbiology, 6(883), 1-15. DOI: https://doi.org/10.3389/fmicb.2015.00883
Li, B., Li, Q., Xu, Z., Zhang, N., Shen, Q., & Zhang, R. (2014). Responses of beneficial Bacillus amyloliquefaciens SQR9 to different soilborne fungal pathogens through the alteration of antifungal compounds production. Frontiers in Microbiology, 5(2014) 636-645. DOI: https://doi.org/10.3389/fmicb.2014.00636
Locato, V., Pinto, M. C., Paradiso, A., & Gara, L. (2010). Reactive oxygen species and ascorbate glutathione interplay in signaling and stress responses. In S. D. Gupta (Ed.), Reactive oxygen species and antioxidants in higher plants (p. 178-203). Enfield, UK: Science Publishers.
Lusso, M. F. G., & Pascholati, S. F. (1999). Activity and isoenzymatic pattern of soluble peroxidases in maize tissues after mechanical injury or fungal inoculation. Summa Phytopathologica, 25(3), 244-249.
Maciel, C. G., Walker, C., Muniz, M. F. B., & Araujo, M. M. (2014). Antagonismo de Trichoderma spp. e Bacillus subtilis (UFV3918) a Fusarium sambucinum em Pinus elliottii engelm. Revista Árvore, 38(3), 505-512. DOI: http://dx.doi.org/10.1590/S0100-67622014000300013
Marcuzzo, L. L., & Schuller, A. (2014). Sobrevivência e viabilidade de escleródios de Sclerotium rolfsii no solo. Summa Phytopathologica, 40(3), 281-283. DOI: https://doi.org/10.1590/0100-5405/1951
Mariano, R. L. R. (1993). Métodos de seleção "in vitro" para controle microbiológico. Revisão Anual de Patologia de Plantas, 1, 369-409.
Meissner, R., Jacobson, Y., Melamed, S., Levyatuv, S., Shalev, G., Ashri, A., … Levy, A. (1997). A new model system for tomato genetics. The Plant Journal, 12(6), 1465-1472. DOI: https://doi.org/10.1046/j.1365-313x.1997.12061465.x
Méndez-Bravo, A., Cortazar-Murillo, E. M., Guevara-Avendaño, E., Ceballos-Luna, O., Rodríguez-Haas, B., Kiel-Martínez, A. L., … Reverchon, F. (2018). Plant growth-promoting rhizobacteria associated with avocado display antagonistic activity against Phytophthora cinnamomi through volatile emissions. PLoS ONE, 13(3), 1-18. DOI: https://doi.org/10.1371/journal.pone.0194665
Michereff, S. J., Silveira, N. S. S., & Mariano, R. L. R. (1994). Antagonismo de bactérias sobre Colletotrichum graminicola e potencial de biocontrole da antracnose do sorgo. Fitopatologia Brasileira, 19(4), 541-545.
Napoleao, R., Nasser, L., Lopes, C., & Cafe Filho, A. (2006). Neon-S, novo meio para detecção de Sclerotinia sclerotiorum em sementes. Summa Phytopathologica, 32(2), 180-182. DOI: https://doi.org/10.1590/S0100-54052006000200014
Oliveira, M. D. M., Varanda, C. M. R., & Félix, M. R. F. (2016). Induced resistance during the interaction pathogen x plant and the use of resistance inducers. Phytochemistry Letters, 15, 152-158. DOI: https://doi.org/10.1016/j.phytol.2015.12.011
Pascholati, S. F., & Dalio, R. J. D. (2018). Fisiologia do parasitismo: como as plantas se defendem dos patógenos. In L. Amorim, J. A. M. Rezende, & A. Bergamin Filho (Eds.), Manual de Fitopatologia: Princípios e conceitos (p. 424-450). Ouro Fino, MG: Editora Agronômica Ceres Ltda.
R Core Team (2020). R: A language and environment for statistical computing. Vienna, AT: R Foundation for Statistical Computing. Retrieved on May 10, 2021 from Retrieved on May 10, 2021 from https://www.R-project.org/
Rabinovitch, L., & Oliveira, E. J. (2015). Coletânea de procedimentos técnicos e metodologias empregadas para o estudo de Bacillus e gêneros esporulados aeróbios correlatos. Rio de Janeiro, RJ: Montenegro Comunicação.
Reczek, C. R., & Chandel, N. S. (2015). ROS-dependent signal transduction. Current Opinion in Cell Biology, 33, 8-13. DOI: https://doi.org/10.1016/j.ceb.2014.09.010
Reis, A., Costa, H., & Lopes, C. A. (2007). Epidemiologia e manejo do mofo-branco em hortaliças. Brasília, DF: Embrapa Hortaliças.
Rocha, D. J. A., & Moura, A. B. (2013). Biological control of tomato wilt caused by Ralstonia solanacearum and Fusarium oxysporum f. sp. lycopersici by rhizobacteria. Tropical Plant Pathology, 38(5), 423-430. DOI: https://doi.org/10.1590/S1982-56762013005000025
Shaner, G., & Finney, R. E. (1977). The effect of nitrogen fertilizationon the expression of slow mildewing resistance in knox wheat. Phytopathology, 67, 1051-1056. DOI: https://doi.org/10.1094/Phyto-67-1051
Sharma, P., Jha, A. B., Dubey, R. S., & Pessarakli, M. (2012). Reactive oxygen species, oxidative damage, and antioxidative defense mechanism in plants under stressful conditions. Journal of Botany, 12, 1-26. DOI: http://dx.doi.org/10.1155/2012/217037
Singh, D., Yadav, D. K., Chaudhary, G., Rana, V. S., & Sharma, R. K. (2016). Potential of Bacillus amyloliquefaciens for biocontrol of bacterial wilt of tomato incited by Ralstonia solanacearum. Journal of Plant Pathology & Microbiology, 7(1), 1-6. DOI: http://dx.doi.org/10.4172/2157-7471.1000327
Stangarlin, J. R., Kuhn, O. J., Toledo, M. V., Portz, R. L., Schwan-Estrada, K. R. F., & Pascholati, S. F. (2011). A defesa vegetal contra fitopatógenos. Scientia Agraria Paranaensis, 10(1), 18-46. DOI: http://dx.doi.org/10.1818/sap.v10i1.5268
Toledo, D. S., Costa, C. A., Bacci, L., Fernandes, L. A., & Souza, M. F. (2011). Production and quality of tomato fruits under organic management. Horticultura Brasileira, 29(2), 253-257. DOI: https://doi.org/10.1590/S0102-05362011000200022
Tománková, K., Luhová, L., Petrivalský, M., Peè, P., & Lebeda, A. (2006). Biochemical aspects of reactive oxygen species formation in the interaction between Lycopersicon spp. and Oidium neolycopersici. Physiological and Molecular Plant Pathology, 68(1-3), 22-32. DOI: https://doi.org/10.1016/j.pmpp.2006.05.005
Umesha, S. (2006). Phenylalanine ammonia lyase activity in tomato seedlings and its relationship to bacterial canker disease resistance. Phytoparasitica, 34(1), 68-71. DOI: https://doi.org/10.1007/BF02981341
Vieira, B. S., Vieira, H. M. P., Sousa, L. A., & Mendonça, K. D. R. (2016). Potencial antagonístico de Bacillus subtilis (bsv-05) contra os patógenos radiculares do feijoeiro: Fusarium spp., Macrophomina phaseolina e Rhizoctonia solani. Ciência Agrícola, 14(1), 59-66. DOI: https://doi.org/10.28998/rca.v14i1.2333
Vinodkumar, S., Nakkeeran, S., Renukadevi, P., & Malathi, V. G. (2017). Biocontrol potentials of antimicrobial peptide producing Bacillus species: multifaceted antagonists for the management of stem rot of carnation caused by Sclerotinia sclerotiorum. Frontiers in Microbiology, 8(446), 1-13. DOI: https://doi.org/10.3389/fmicb.2017.00446
Vogelsang, R., & Barz, W. (1993). Purification, characterization and differential hormonal regulation of a β-1,3-glucanase and chitinases from chickpea (Cicerarientinum L.). Planta, 189, 60-69. DOI: https://doi.org/10.1007/bf00201344
Yarzabal, L., & Chica, E. J. (2019). Role of rhizobacterial secondary metabolites in crop protection against agricultural pests and diseases. In V. K. Gupta, & A. Pandey (Eds.), New and future developments in microbial biotechnology and bioengineering: microbial secondary metabolites biochemistry and applications (p. 31-53). Amsterdam, NT: Elsevier.
Yuan, Y. J., Li, C., Hu, Z. D., & Wu, J. C. (2002). A double oxidative burst for taxol production in suspension cultures of Taxus chinensis var. mairei induced by oligosaccharide from Fusarium oxysporum.Enzyme and Microbial Technology, 30(6), 774-778. DOI: http://dx.doi.org/10.1016/S0141-0229(02)00057-1
Author notes
* Author for correspondence. E-mail: pradomattosa@gmail.com