Artículo original

Pipe bridge design optimisation through a comparative study of truss and girder arrangements***

Optimización del diseño de puente de tubería mediante un estudio comparativo de cercha y viga

S.V. Sivapriya *
Department of Civil Engineering, India
S. Sadhana
Department of Civil Engineering, India
N. Prathibha
Department of Civil Engineering, India
S. Saranya
Department of Civil Engineering, India

Pipe bridge design optimisation through a comparative study of truss and girder arrangements***

Revista Facultad de Ingeniería Universidad de Antioquia, no. 106, pp. 56-65, 2023

Facultad de Ingeniería, Universidad de Antioquia

Received: 04 August 2020

Accepted: 13 September 2021

ABSTRACT: Pipe bridges are structures that play an indispensable role in chemical and oil plants. They support cable trays or pipe-carrying material. This study aims to identify the ideal configuration of a pipe bridge through the comparative study of girders with drop hanger and truss arrangements for three different spans. The most efficient arrangement for each span was suitably identified. Through the analysis carried out, it was then identified that the Girder arrangement is suitable for smaller spans such as 15 meters; while the truss arrangement was preferable for longer spans.

Keywords: Pipe bridge, girder, truss, design, analysis.

RESUMEN: Los puentes de tuberías son estructuras que juegan un papel indispensable en las plantas químicas y petroleras. Estas soportan haces de cables o material de transporte de tuberías. Este estudio tiene como objetivo identificar la configuración ideal de un puente de tubería a través del estudio comparativo de arreglos de cerca y viga para tres tramos diferentes. La disposición más eficiente para cada tramo se identificó adecuadamente. A través del análisis realizado, se identificó que la disposición de la viga es adecuada para tramos más pequeños hasta 15 metros; mientras que la disposición de la cercha fue la más favorable para tramos más largos.

Palabras clave: Puente de tubería, viga, armadura, diseño, análisis.

1. Introduction

Pipe bridges are vital structures in industrial plants for chemical, oil, gas and road or railway crossings to support pipes and cable trays. Pipe racks extending over process structures, road or railway crossings are commonly referred to as pipe bridges. Often, pipe racks also support mechanical equipment, valve access platforms, and vessels in process units. Pipe bridges transfer material between equipment and storage areas. The most predominately used arrangements in the current day industrial practice are girder and truss arrangements.

Commonly the process lines are to be kept at a lower tier and utility and hot process lines are to be kept on the upper tier. The top tier is to be kept for electrical cable trays and instrument cable ducts to avoid short circuits, likely to be caused due to pipe leakage. To allow maintenance access under pipe bridges, transverse frames are used. They are typically moment-resisting frames that support gravity loads and resist lateral loads transverse to the pipe rack. The consideration needs to be given to the arrangement of pipe racks because excess pipe length would add up to the expense, and optimization in design would help in saving capital on structural steel and civil costs.

The design of steel rack pipe have been studied and proposed building code, industry practice design criteria, design loads, and other design considerations for pipe racks [1]. For Saudi Aramco projects, a separate guidelines for steel pipe rack design is proposed for engineers working i to its requirement[2]. The general design philosophy and requirements to be used in the analysis,design of pipe racks and also the optimal design used in oil and gas industries as per international standards is proposed due to the huge demand in the industry[3]. They also emphasize the use of plan bracings in the top and bottom tiers to control lateral deflection and the introduction of vertical bracings in both transverse and longitudinal direction to transfer the lateral forces to the base. The industrial guidelines for practising engineers and steel fabricators to design steel pipe racks, has been presented and all the critical aspects for the design of pipe racks is well analysed and published[4].

The optimal dimensioning for combined footing for large load footings to meet the contact surface on the soil, the bending moment about X and Z axes in each column developed due to axial load is taken care along with maximum and minimum stress[5]. The EMETL provides the standards for allowable spans, clearance, live load conditions based on the diameter of the pipe and the standard pipe-bridge load-application criteria[6].

Previous studies majorly involve understanding the behaviour of pipe rack; hence this study aims to identify the ideal configuration for pipe bridges by comparing truss and girder arrangements over three-span lengths.

The key objectives of this study are:

2. Methodology

The pipe bridge structure was modelled on STAAD Pro and the member properties were assigned to the structural steel members. Fixed supports were assigned to all the nodes that were to be joined to the foundation pedestals to prevent any further movement and rotation. . The 20 m and 30 m span pipe bridges were modelled similarly; the inter stub span for the 20 m spans was designed to be 4 m. The cross-section and the line sketches of the 15 m span pipe bridges modelled have been illustrated below [Figures 1 to 3].

The live loads were calculated and applied at nodes. The wind load intensity was calculated according to the horizontal and vertical dimensions from its corresponding nodal, and uniformly distributed wind loads were also calculated; the anchor load was identified based on piping requirements. Table. 1 gives a summary of the load definitions and calculations [7].

The live load on the top and bottom tiers were assigned as uniformly distributed load and the self-weight load was assigned to all the members. The Wind load was assigned as nodal loads in the positive and negative X directions and as wind intensity in the Z directions. The Anchor load was assigned in the braced bay frame as per piping specifications. The wind load, anchor load, live load and dead load have been assigned as calculated in both configurations of all 3 spans [Table 1]. Figure 4 to Figure 7 depict a few of the loads assigned in each span.

The design parameters such as the deflection, slenderness limits and shear releases were assigned. The girder and truss arrangements were analysed using STAAD Pro and the results were studied [9]. The members’ utility/ unity ratios for each member, displayed in the post-processing mode was optimized to optimal ratios based on the governing factors such as deflection, bending, and slenderness. The overall costs for fabrication, transport, and erection were also calculated.

The design of the foundation was done using MAT3D software[10]. The checks for bearing pressure and stability were carried out using the software for a cohesionless soil with a unit weight of 18 kN/m3 with a minimum bearing pressure of 150 kN/m2 with the linear application as input parameters. Figure 8 shows the model generated and obtained analysis report. The foundations’ settlement behaviour and base pressure variations were analysed.

Line sketch of 15m Girder Configuration
Figure 1
Line sketch of 15m Girder Configuration

Top View of Truss of 15m Truss Configuration
Figure 2
Top View of Truss of 15m Truss Configuration

Left, Right side and Front View of 15m Truss Configuration
Figure 3
Left, Right side and Front View of 15m Truss Configuration

Table 1
Load definition Summary
Load definition Summary

Wind Load application on 15m girder configuration in +X direction
Figure 4
Wind Load application on 15m girder configuration in +X direction

Wind Load application in 15m girder configuration in +Z direction
Figure 5
Wind Load application in 15m girder configuration in +Z direction

3. Results and discussion

The steel member take-off, cost, and member profiles of girder and truss arrangements for the three spans have been compared as illustrated in Table 2 - 4.

The following chart [Figure 9, 10] illustrates that the trend of the steel member take-off for the two arrangements varies in proportion to the span length.

It could be used to finalize the pipe bridge arrangement to be used for a specific span. Further, the steel quantities required and the corresponding costs of pipe bridge construction can be, therefore, predicted using the quadratic equation from the resultant data. The base pressures developed in the foundation are depicted in the form of contours [Figure 11 - 16].

The longitudinal beams and vertical bracings in the truss arrangement tend to transfer a higher load to the columns than that of the girder arrangement. This results in a difference in the direction and magnitude of moments acting on the pedestal, thereby affecting the base pressure distribution.

Anchor Load Application on 15m Truss configuration
Figure 6
Anchor Load Application on 15m Truss configuration

Live Load Application on 30m beam configuration in Tier 2
Figure 7
Live Load Application on 30m beam configuration in Tier 2

Input and output in MAT3D
Figure 8
Input and output in MAT3D

Table 2
Comparison between 15m Girder and Truss arrangement
Comparison between 15m Girder and Truss arrangement

Table 3
Comparison between 20m Girder and Truss arrangement
Comparison between 20m Girder and Truss arrangement

The following are the observations from the study;

Table 4
Comparison between 30m Girder and Truss arrangement
Comparison between 30m Girder and Truss arrangement

Trend line chart illustrating the variation of steel member take-off with span
Figure 9
Trend line chart illustrating the variation of steel member take-off with span

Settlement behaviour Chart
Figure 10
Settlement behaviour Chart

Base Pressure distribution in 15m Girder Arrangement (DL+LL+AL)
Figure 11
Base Pressure distribution in 15m Girder Arrangement (DL+LL+AL)

12 Base Pressure distribution in 15m Truss Arrangement (DL+LL+AL)
Figure
12 Base Pressure distribution in 15m Truss Arrangement (DL+LL+AL)

4. Conclusions

Increased new-car demands also increases the need for fossil fuels. The cost of transportation from the primary source to the required location increments with an increase in distance, which varies depending upon the material/ arrangement. A detailed analysis was developed to identify the optimum span length for girder and truss arrangements. The structure was modelled using STAD Pro. and analysed through MAT 3D; the parameter analysed are steel member take-offs and deflections.

The conclusion differs for spans less than and more than 15 m lengths. For a comparatively shorter span length i.e., less than 15 m, the girder with a hanger arrangement is efficient; but for a span length of more than 15 m, the truss is more efficient.

Base Pressure distribution in 20m Girder Arrangement (DL+LL+AL)
Figure 13
Base Pressure distribution in 20m Girder Arrangement (DL+LL+AL)

Base Pressure distribution in 20m Truss Arrangement (DL+LL+AL)
Figure 14
Base Pressure distribution in 20m Truss Arrangement (DL+LL+AL)

Base Pressure distribution in 30m Girder Arrangement (DL+LL+AL)
Figure 15
Base Pressure distribution in 30m Girder Arrangement (DL+LL+AL)

Base Pressure distribution in 30m Truss Arrangement (DL+LL+AL)
Figure 16
Base Pressure distribution in 30m Truss Arrangement (DL+LL+AL)

Acknowledgments

The authors thank Sri Sivasubramaniya Nadar College of Engineering College, Chennai, India - Management for their support to use the computer labs to do the analysis.

REFERENCES

R. M. Drake and R. J. Walter, “Design of structural steel pipe racks,” Engineering Journal, 2010. [Online]. Available: https://sefindia.org/forum/files/design_of_structural_steel_pipe_racks_115.pdf

Steel Piperack Design, Onshore Structures standards Committee, 2002. [Online]. Available: https://www.sefindia.org/forum/files/design_of_piperack_133.pdf

N. J. Singh and M. Ishtiyaque, “Optimized design and analysis of steel pipe racks for oil and gas industries as per international codes and standards,” IJRET: International Journal of Research in Engineering and Technology, vol. 5, no. 10, Oct. 2016. [Online]. Available: t.ly/2jzID

O. Bedair, “Rational design of pipe racks used for oil sands and petrochemical facilities,” Practice Periodical on Structural Design and Construction, vol. 20, no. 2, May. 2015. [Online]. Available: https://doi.org/10.1061/(ASCE)SC.1943-5576.0000224

S. López-Chavarría, A. Luévanos-Rojas, and M. Medina-Elizondo, “Optimal dimensioning for the corner combined footings,” Advances in Computational Design, vol. 2, no. 2, 2017. [Online]. Available: https://doi.org/10.12989/acd.2017.2.2.169

EMETL, EMETL Practice standards, 2018.

Process Industry Practices Machinery PIP REEE005, Construction Industry Institute, 2007.

Code of Practice for Design Loads (Other than Earthquake) for Buildings and Structures, Part 3: Wind Loads, Bureau of Indian Standards, 1987.

Technical refence manual, Bentley Sustaining Infrastructure, 2012.

Foundation Design Solutions, ImageGrafix Engineering Services Pvt.Ltd, 2020.

Notes

* Data Availability: The authors confirm that the data supporting the findings of this study are available within the article [and/or] its supplementary materials.
** CITETHIS ARTICLE AS: S. V. Sivapriya, S. Sadhana, N. Prathibha and S. Saranya.”Pipe bridge designoptimisation through acomparative study of truss andgirder arrangements”,RevistaFacultad de IngenieríaUniversidad de Antioquia, no.106, pp. 56-65, Jan-Mar 2023. [Online]. Available: https://www.doi.org/10.17533/udea.redin.20210957
Funding: The author(s) received no financial support for the research, authorship, and/or publication of this article.

Author notes

Authors Contribution: Dr.Sivapriya S.V analysed the result and complied the paper. Where S. Sadhana, N. Prathibha and S. Saranya did the analysis for this study.

*Corresponding Author : S.V. Sivapriya, e-mail: sivapriyavijay@gmail.com

Conflict of interest declaration

Declaration and competing interest: We declare that we have no significant competing interests, including financial or non-financial, professional, or personal interests interfering with the full and objective presentation of the work described in this manuscript.
HTML generated from XML JATS4R by